Facing bricksLinea7 7022

Technical data sheets

Color description
The bricks are through-coloured and the colour is purple-brown-grey.
Manufacturing dimensions (L x W x H)
ca. 240x73x38 mm (LxWxH)
Quantity / m² with a traditional joint
80 (12 mm)
Number / m² with a thin joint
93 (6 mm)
size 2
ca. 240x115x38 mm (LxWxH) - on demand for projects > 2000m²

case studie Linea7 7022

Slim facing brick Linea7 7022 in harmony with nature

Slim facing brick Linea7 7022 in harmony with nature

Elegant assymetrical villa in the green suburbs of Ghent

This elegant villa is situated in the Latemse Meersen nature reserve, in the green suburbs of Ghent along the right bank of the Lys. The task was to design a house which provided the best possible view of the beautiful nature reserve in the south.  

References

Search by city





Reference list Linea7 7022
Postal code City Street Bond Joint Joint colour Window Roofing Remarks
9880 Aalter Weibroekdreef 125 Random bond 6 mm
3791 VV Achterveld Ruurd Visserstraat 67 12 mm
3791 VV Achterveld Ruurd Visserstraat 67 Random bond 12 mm
8850 Ardooie Hellestraat 3 E Random bond 6 mm
7800 Ath Chaussée de Bruxelles 344b Stretcher bond 12 mm
5954 CA Beesel Hoornpost 15 Random bond 12 mm
1301 Bierges Rue Dolimont 10 Random bond 6 mm
4654 Charneux Rue Beauregard 149
4654 Charneux Rue Beauregard 149 Random bond 6 mm
9840 De Pinte Lijsterbesstraat 7 Random bond with strike-through joint 12 mm
Print all

How to Install ?

Preparation of the construction site

Quality brickwork starts with the proper storage of the materials. Provide a firm level base so that bricks are not in contact with rain and/or dirt.  
As clay is a natural material, successive production runs of the same kind of bricks may present colour variations and size tolerances.
The following precautions will help minimizing this:
  • Always order the full amount of bricks required for a specific site. In this way, the entire order can be made during one production run.
  • Try to have the full order supplied at one time. If this creates several deliveries, always mix a number of packs from the previous delivery with a number of packs from the new delivery. This procedure is especially recommended in case of re-order or for an additional order.
  • Take bricks diagonally across the pack.
  • Draw and use bricks from at least five different packs.
  • For setting out, use bricks from the delivery made to the site in question. Do not exclusively use the theoretical dimensions of the brick, or samples previously supplied, or different production run from that intended for the site.
  • As soon as the bricks arrive on site, check delivery tickets and certificates against the specification and order. Also check that there are no visible inconsistencies with the order.
  • Do not lay bricks in freezing weather or protect the ‘fresh’ masonry with insulating mats in order to avoid frost damage to the mortar.
  • In the case of prolonged dry hot weather, lightly dampen the newly laid brickwork to stop the mortar drying and curing too quickly.
  • Do not lay bricks in precipitation in order to prevent mortar from running on the wall.

Avoid Efflorescence

Brickwork is sometimes marred by white bloom. This efflorescence is usually caused because bricklaying is done under unfavourable weather conditions. The necessary protective measures are often not implemented due to a tight schedule and fast building pace. In very wet conditions, water in soluble substances can result in efflorescence on the surface. In spring as well as autumn, after a wet period (when the brickwork has dried again), soluble substances can rise to the surface as a result of moisture transport. After evaporation of the water, a white bloom is left behind. (Source: Efflorescence on brickwork – Heidelberg Cement Group)
 
Efflorescence on brickwork is always likely to occur. There is no brick - or combination of a certain brick with a specific mortar - that is absolutely efflorescence-free. By taking a few simple precautions, the risk of efflorescence can be reduced.
  • During and after laying, protect the newly built brickwork for a height of at least 60 cm - but ensure there is airspace between the brick face and the waterproof covering.
  • Provisionally install rainwater down pipes to avoid saturation of the newly laid brickwork
  • Never lay bricks in driving rain conditions